Files
vlt/SwD/UREZ-ONI/Deliverables.md
T
2026-09-18 23:22:55 +10:00

5.8 KiB
Raw Blame History

Downward pressure on energy prices

Function Block Deliverable / Dependency Staff Min Months Max Months
Registration & Discovery CSIPAUS 1.3 Battery Extensions 1 0
Registration & Discovery Droplet work to integrate with Battery 2 0
Assignment & Portability
Integration with customer consent to add to population
PUT /populations/test { customerConsent }
Assignment & Portability
ONI Data work for population
Population Management
ONI Data work for population mgmt
Population Management
Delegate populations to FSAs (or whatever)
Status & Telemetry Aggregate population telemetry being delivered to retailer
Status & Telemetry Device level telemetry available via query / pushed
Contraints Forecasting the weatherman
endpoint in ONI for making available forecasts
Contraints Forecasting store DOEs / forecasts
Maintenance Notifications of device issues
Maintenance Assurances
Retailer Controls Portfolio mgmt (could be gnarly because time based: eg slices of community battery)
Control Resolution ONI Primacy
Control Resolution Constraint engine reference (3 ausgrid algos) 0

Registration & Discovery

Key Elements

  • CER/DER asset is registered for access via interface interface presumable == ONI
  • Assets can be discovered and participate in functions below

Deliverable

  • Can already do this with DER via ControlPlane
    • Convert that to ONI?
  • need to prove it with something new?
    • battery?
    • 2030p5 stuff for batteries
  • Synergy defining CSIP aus 1.3 ext for batteries

Assignment and Portability

Key Elements

  • Asset assigned to retailer (by consumer choice)
  • Consumer’s assets grouped together
  • Assets ported between retailers (on consumer’s election)

Deliverable

  • mechanism for consumer to choose to be assigned / listed

    • retailer integration
      • NRN
  • Assume ONI reference impl server w/ big postgres managing groups

Population Management

Key Elements

  • Retailer organises assigned assets into one or more groups; reporting/control will be managed by groups

Deliverable

  • ONI -> FSAs ?
  • Assume ONI reference impl server w/ big postgres managing groups

Status & Telemetry

Key Elements

  • DNSPs periodically report status and telemetry by population

Deliverable

ONI to implement Langdale(TM) data models of aggregate telemetry data IEC CIM?

population telemetry -> UTSRV -> ONI -> retailer also needs individual device info - push / pull ? - get telemetry by lfdi /id

Constraint Forecasts

Key Elements

  • DNSPs issue DOE forecasts for upcoming period

Deliverable

the weatherman curtailment events predicted to be activated in the next day publish predicted DOEs via schedule distinct from DOE schedule

Maintenance

Key Elements

  • DNSPs report on a Retailer’s assets in errored states

Deliverable

  • assurance -> ONI
  • resolutions (implies existence of issue / tickets)

Retailer Controls

Key Elements

  • Individual consumer group control
    • group of devices connected to a site
  • Retailers apply controls by population

Deliverable

  • utility server does it
  • hook utility sever up to UoW Battery
  • populations via FSA?
  • Customer Portfolio
    • Solar on roof
    • Battery in shed
    • Community Battery that they get from 10-11am daily
    • Community Battery that they get 10kwhr / day

Control Resolution

Key Elements

  • DNSPs check DOE bounds as controls are exercised
  • Determine how controls are dispatched across populations

Deliverable

  • Resolution of DOEs originating from retailer against restrictions set by DNSP

roughly == primacy?

retailler sends 20kw xplim dnsp for same site has specified 10kw xplim

report on violation

ausgrid 3 algorithms for application

Retailer forecasts (stretch)

Key Elements

  • DNSPs check DOE bounds as controls are exercised
  • Determine how controls are dispatched across populations

Deliverable

Pricing signals

Key Elements

  • Pricing signals Retailer → ONI → CSIP-AUS → CER Client
  • Pricing signals from DNSP → ONI → Retailer